Permit-to-work at the boom gate: contractor access done right
On a corporate floor, a failed check-in is an inconvenience. On a plant floor, it is a safety incident waiting to happen. Industrial access is where visitor management stops being about hospitality and starts being about lives.
No permit, no boom
The core principle is simple: nobody passes the gate without a valid, current permit-to-work and a completed safety induction. MyGatePass enforces this automatically — the gate simply will not open for a crew member whose induction has lapsed.
- Bulk pre-register entire contractor crews with induction status attached.
- Vehicle gates check plates and delivery manifests at the loading bay.
- A live, zone-by-zone roster shows exactly who is on site in an incident.
The outcome facility and HSE teams care about most: zero unlogged contractor hours, and an audit the safety regulator can complete in an afternoon.