Industrial

Metal Park

Metal Park is the UAE’s largest industrial recycling complex, processing over a million tons annually across 18 km² and 2,400 contractor crews. Contractor access was running on paper gate passes with no induction enforcement.

0
unlogged contractor hours
2,400
crews managed
18km²
site secured

The challenge

Contractor crews were waved through the gate on paper passes, with no reliable check that a valid permit-to-work or safety induction was in place. During an incident, there was no live count of who was on a hazardous site, and vehicle and manifest checks were entirely manual.

The approach

MyGatePass made permit-to-work the gate condition: no valid permit, no access. Crews are bulk pre-registered with induction status attached, vehicle gates verify plates and manifests, and a live zone-by-zone roster shows exactly who is on site at any moment.

The results

  • Every contractor hour is now logged against a valid, current permit.
  • Vehicle gates verify plates and delivery manifests automatically.
  • A live site roster gives HSE an instant headcount by zone in any incident.
“Every contractor hour on this site is now logged against a valid permit. The safety regulator’s audit took an afternoon, not a month.”
— HSE Director, Metal Park